Our project at Imperial College London White City Campus includes the installation of a new bridge over the Central Line.
In the small hours of Sunday night, the project team oversaw the installation of the first section of steel work for the bridge – a huge beam measuring 22 metres and weighing 28 tonnes - which required the use of a specialist crane and lifting team and positioning into place with millimetre accuracy.
The short video below captures this intricate piece of work…
We'd love to hear from you, so please get in touch